Rigging
The Now Building has integrated rigging points in the ceiling. These points are located above the ceiling screen and require a member of our front-of-house technical team to remove LED panels before accessing. There may be a cost to cover our front-of-house technical team’s time. Please ask our Event team for more information.
The roof has a total Safe Working Load (SWL) of 5000kg. Each point has a SWL of 1000kg. Each beam can take no more than 1000kg in total (see below drawing).

Download Ceiling Rigging Drawing
Outernet London will supply a Front of House Engineer to oversee all rigging installations. Please ensure you budget for this. See Event Services Rate Card for more details.
All rigging plans, including full weight loadings, must be included with your structural drawings for review and approval by The Outernet Safety Team.